USB charging port
PM41-B14U Dual USB charging port
price

$0.40 - $0.60 / piece

PM41-B14U
1 piece
Shenzhen
Quantity
  • Type:Electric
  • Usage:Universal 
  • Material:PC Fireproof Material
  • Protection:Short Circuit Protection, ovp, OTP, OLP, ocp, Other, Low Tension, Over-charging, Overcurrent, Overvoltage
  • Function:No
  • Brand Name:PIMI
  • Model Number:PM41-B14U
  • Port:2 X USB
  • Place of Origin:China
  • Product name:dual USB charging ports
  • Application:universal
  • Output constant current:2.1A
  • input voltage:30VDC
  • output voltage 1:5VDC
  • Certificates:CE FCC ROHS
Product Description
 PM41-B14U
Dual USB charging port

Place of Origin

Guangdong, China

Brand Name

PIMI

Max. Load Power

36W

Voltage

30VDC 

Product name

Dual USB charging port

Contact Resistance

30mR(Max) 

Insulation withstanding voltage

4000V max

Output Current

2000mA max

Insulation Resistance

1000 MEGA min

Mate force3.57kgf max
Unmate force1.02kgf min
Metal materialCopper alloy, nickel plating
Plastic materialHigh temperature PC
Dimension: 25.5mm*21mm*13mm(depth)

 

 

 

 

 

Company Information

 

Our Services

 

Packaging & Shipping

 

 

 

FAQ

 

Q1: Are you manufacturer?

A: Yes, our factory has been set up for 8 years. You are welcome to visit us in Dongguan.

 

Q2: Can you OEM or ODM?


A: Yes, we have strong developing team. The products can be made according to your resquest.

Q3. Can I have a sample order for LED light?

A: Yes, we welcome sample order to test and check quality.


Q4. How do you ship the goods and how long does it take to arrive?

A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.


Q5: Is the sample available?
A: Yes, we are very glad to make the samples for your testing.


Q6: What is the warranty?
A: The LED lights have 3 years warranty. If it is our quality problem, we will replace the new one for the broken


Q7: How long is the production time?
A: For samples, the lead time is about 7days. For mass production, the lead time is 20-30days after receiving the deposit payment.