$3.00 - $4.00 / piece
- Warranty(Year):2-Year
- Lighting solutions service:auto CAD layout
- Place of Origin:Guangdong, China
- Brand Name:PIMI
- Type:MANUAL SWITCH
- Max. Load Power:36W
- Product name:LED touch dimmer switch
- Input Voltage:12-24 VDC, 36-48 VDC
- Output Voltage:12-24 VDC, 36-48 VDC
- Output Current:2000mA max
- Output power:36W max
- wire:2468 22AWG
- Application:LED light
- Warranty:2 Years
- Certificates:CE FCC ROHS
- Voltage:12-48V DC
PM42-X90A2
LED touch dimmer on line
| Model | Input constant voltage | A output constant voltage | A output current (max) | B output constant voltage | B output current (max) | Dimming mode | Approval |
| PM42-X90A2-200 | 12-24 VDC | 12-24 VDC | 200mA | 12-24 VDC | 1000mA | continuous dimming
step dimming
dimming and changing CCT | CE |
| PM42-X90A2-300 | 12-24 VDC | 12-24 VDC | 300mA | 12-24 VDC | 2000mA | CE | |
| PM42-X90A2-500 | 12-24 VDC | 12-24 VDC | 500mA | 12-24 VDC | 3000mA | CE |
Dimensions(L*W*H): 62*20*11mm
Dimming mode: continuous dimming
4-stage touch dimming
Continuous dimming and adjust color temperature
Features: Output over-load protection
Output short circuit protection
Output open circuit protection
Overheat protection
Meet ROHS requirements
Standard: EN 55015
EN 61000
EN 61547
EN 61058








Q1: Are you manufacturer?
A: Yes, our factory has been set up for 8 years. You are welcome to visit us in Dongguan.
Q2: Can you OEM or ODM?
A: Yes, we have strong developing team. The products can be made according to your resquest.
Q3. Can I have a sample order for LED light?
A: Yes, we welcome sample order to test and check quality.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.
Q5: Is the sample available?
A: Yes, we are very glad to make the samples for your testing.
Q6: What is the warranty?
A: The LED lights have 3 years warranty. If it is our quality problem, we will replace the new one for the broken
Q7: How long is the production time?
A: For samples, the lead time is about 7days. For mass production, the lead time is 20-30days after receiving the deposit payment.





